CONTRACTING

Before starting Apogee, our Director, Steven Barrett, ran a main contracting construction company that carried out many refurbishments, new builds, specialist material installations and much more.

 

Below are a few examples of the contracts that were completed under the management of Steven, furnishing him with the knowledge and skill sets necessary for future commercial developments within Apogee.

BRIXTON RECREATION CENTRE

Replacement glazing to the pool area

 

 

 

STATUS: Main Contractor

DURATION: 4 weeks

LOCATION: Brixton

 

 

We were engaged by the leisure centre's Contracts Manager Tundi at the time, to repair/replace the glazing in the swimming pool area. A complex operation over an operational pool. All the old glazed windows were repaired or replaced without the need to close the pool.

IMAGES COMING SOON

COMMERCIAL & RESIDENTIAL GLAZING

Residential windows, doors, Bi-folds &

Conservatories. Commercial glass

Curtain Walling and glazed roofing.

 

 

STATUS: Main Contractor

DURATION: Days

LOCATION: All of UK

 

 

 

We completed hundreds of glazing contracts across the UK for both residential and commercial clients. Projects ranging from straightforward residential window replacements to structural commercial glazed curtain walling systems.

IMAGES COMING SOON

BRIXTON RECREATION CENTRE

Replacement glazing to the pool area

 

 

 

STATUS: Main Contractor

DURATION: 4 weeks

LOCATION: Brixton

 

 

The leisure centre's Contracts Manager Tundi at the time, contacted us directly to repair/replace the glazing in the swimming pool area. A complex operation over an operational pool. All the old glazed windows were repaired or replaced without the need to close the pool.

PRIMARY SCHOOL EXTENSION BLOCK

New assembly hall, classrooms & toilets

 

 

 

STATUS: Contractor

DURATION: 7 months

LOCATION: Morden

 

 

 

 

 

We were engaged as Lead Contractor below the construction management team, to help deliver the extension block to the school with new classrooms, assembly hall and toilet block. There was sub-contracting of the ground works, superstructure & MEP. We helped to complete the roofing, glazing, internal fit-outs, flooring & decorating.

VARIOUS KITCHEN EXAMPLES

From budget to Rockstar kitchens

 

 

STATUS: Main Contractor

DURATION: 1-6 weeks

LOCATION: London & the South East

 

Many dozens of kitchens were installed, from basic budget kitchens to very bespoke high-end kitchens. Above is a small selection of some of the kitchen styles we were capable of installing across South London and the surrounding counties outside the southern hemisphere of the M25. 

1/12

VARIOUS BATHROOM EXAMPLES

From small shower rooms to the salubrious 

 

 

STATUS: Main Contractor

DURATION: 1-4 weeks

LOCATION: London & the South East

 

 

 

 

Many bathrooms were refurbished and installed, from the small studio apartment shower room to the salubrious his/her 75m2 palatial bathroom suits. Above is a small selection of some of the kitchen styles we were capable of installing across South London and the surrounding counties outside the southern hemisphere of the M25. 